This small alteration and addition project was meant to upgrade a section of our client’s facility in regards to equipment, furniture and electrical. During the length of our project, we demolished and dismantled some work benches and a pony wall. We relocated the section’s equipment and furniture, as well as installed a large new refrigerator. Additionally, we installed a variety of electrical receptacles for the new and altered equipment. This project included demolitions, installations, electrical shutdowns, and full site supervision for the duration of the project.