The primary objective of this replacement project was to remove and install new water heaters in our client’s boiler room. The water heater upgrades additionally included regulator, circulation pump and expansion tank upgrades. After the install of the new water heater, we were tasked with connecting them to the existing manually operated emergency shutdown switch. The project included work within the client’s facility and included demolition, removal of equipment, installation, connections, electrical, patching, painting, permits, and cleanup.