The primary objective of this project was to remove existing ceiling tiles to accommodate new equipment installation. The project also included the demolition and salvage of bump doors, and installation of strip curtains. A forklift was used for the replacement of the existing 2’x2′ to 2’x4 ceiling grids totaling 40’x50′.