This alteration and addition project was meant to upgrade part of our client’s workspace in regards to the ceiling grid, concrete pad and interior doors. During the length of our project, we installed temporary walls and strip curtains so that our client’s operations could proceed unimpeded around our construction upgrades. The project included demolition, temporary installations, ceiling grid rework, concrete, and finishes.