This small Facilities Sustainment, Restoration, and Modernization (SRM) project was meant to fabricate and install pedestals and clips under the flooring for an industrial material auto-cutter. The scope of work for the project included removing the floor tiles, cutting the floor framing and installing the pedestals and z-clips underneath the floor. This project included labor, materials, onsite supervision and management for the project’s scope of work within the installation area.